The house is coming along nicely at this point. Here is what happened the last half of August.
![]() |
| 8.13.13 First floor framed |
![]() |
| 8.14.13 Second floor framed |
| 8.15.13 Drying in the house...roof on. |
| 8.17.13 3rd garage bay finally framed. |
| 8.18.13 Checking out the view from the office. |
![]() |
| 8.21.13 House is plumbed and all bathtubs in place. |
| Learning Spanish along the way. |
| 8.22.13 Fireplace installed. |
| 8.22.13 Doors installed. |
| 8.22.13 Bricks ready to go on. |
| 8.27.13 I took A LOT of pictures of wires. I'll spare you all those details. |
| I love going out to the house each night. We see some spectacular sunsets on our way. This is from our front porch. |